Skip to content
EXA ENGINEERING
Structural — Civil — Energy

Engineering the future of infrastructure.

Precision structural analysis, civil construction, and renewable-energy infrastructure for a rapidly evolving world. From roads, bridges, and underpasses to Pakistan's largest solar arrays, we calculate the stability of tomorrow's landscapes before a single beam is set.

0+
Projects Delivered
0 MW
Largest Single Project
24/7
Monitoring Desk
DWG NO. EXA—0142SCALE N.T.S.
SPAN 240.0 M4.2 kN/m²4.2 kN/m²A36 STEEL PYLON
CERTIFIED ENGINEERING TEAM700+ SYSTEMS DELIVEREDPAKISTAN'S LARGEST 150 MW PROJECTOPERATIONS DESK: 24/7/365
Interactive Model

Inspect the structure.

A through-truss deck bridge, rendered live from the same geometry our analysis engine solves against. Drag to orbit, or let it turn. Every node is a calculated connection point.

0
Connection Nodes
0
Truss Members
A36
Steel Grade
1.6×
Safety Factor
MODEL EXA—0142 · LIVE RENDERDRAG TO ORBIT
Trusted by industry & energy operators across Pakistan
BASHIR SONS STEELGOURMET BAKERIESHAJVERY FOODSAL FATEH STEELFIVE STAR STEELAZAAN FLOUR MILL
Core Capabilities

Technical specializations.

Three disciplines, one calculation standard — every deliverable is peer-reviewed and load-tested before it leaves the office.

SPEC / CIV

Structural & Civil Construction

Roads, bridges, underpasses, and buildings — load-bearing analysis and construction oversight run against live seismic, wind, and traffic-load models before a single beam is set.

See projects
SPEC / SOL

Solar & Renewable Energy

Utility-scale and industrial photovoltaic arrays — from 1 MWp rooftops to Pakistan's largest 150 MW field, engineered to the panel with grid-tied integration and net metering.

Explore solar
SPEC / CNS

Engineering Consulting

Data-driven feasibility studies, energy audits, and risk-management protocols for high-stakes programs — every deliverable peer-reviewed before it leaves the office.

Talk to us
CapabilityTypical ScaleStandardsDelivery
Structural & CivilRoads · bridges · buildingsASCE 7, Eurocode8–24 weeks
Solar & Renewable1–150 MW arraysIEC 61215 / 617308–36 weeks
Engineering ConsultingAny project scaleISO 9001, ISO 310002–6 weeks
Industries Served

Exa Engineering has delivered across nine industry sectors, from steel mills to food processing.

PharmaceuticalsFlour MillsSteel MillsRice MillsEducationFood IndustryBeverage IndustryCooperative SocietiesControl Sheds
0+
Projects Delivered
0 MW
Largest Single Project
0
Industry Sectors Served
0
Structural Failures On Record
How We Deliver

A four-stage sequence, every time.

No shortcuts between site data and signed-off structure. Each stage closes with a written sign-off before the next begins.

STAGE 01

Survey & Site Data

Geotechnical surveys, load-history data, and resource studies collected on site.

STAGE 02

Engineering & Modeling

Finite-element analysis against seismic, wind, traffic, and live-load scenarios.

STAGE 03

Validation & Testing

Independent peer review and physical load-testing of every critical assembly.

STAGE 04

Construction Oversight

On-site inspection through to commissioning and as-built sign-off.

Aerial view of an Exa Engineering utility-scale solar installation
FIG. 03 — SITE REVIEWREV. A
Our Standards

Technical rigor, by the numbers.

Exa Engineering (Private) Limited is a broad-spectrum engineering firm delivering structural, civil-construction, and renewable-energy projects across Pakistan. Our certified engineers bring decades of combined experience — and we're proud to have delivered Pakistan's largest solar project at 150 MW, alongside 700+ installations across nine industry sectors.

  • 01
    Certified Engineering Team

    Certified engineers and technicians delivering every project to the highest national and international standards.

  • 02
    Data-Driven Design

    Predictive modeling ensures structural longevity and long-term safety margins on every build.

  • 03
    Independent Peer Review

    Every critical calculation is checked by a second licensed engineer before sign-off.

Featured Project

Bashir Sons Steel Industry — 5 MWp

Aerial view of the 5 MWp Bashir Sons Steel Industry solar installation

A megawatt-scale grid-tied solar installation for one of Pakistan's leading steel mills. Exa Engineering delivered array design, structural racking, and construction oversight — powering heavy industrial operations with 5 MWp of clean energy and setting a new benchmark for industrial solar adoption in Pakistan.

5 MWp
Nameplate Capacity
Grid-Tied
Integration
Heavy Ind.
Sector
Kala Shah Kaku
Location
Exa Engineering delivered a massive solar solution that powers our entire steel operation. The savings and reliability have exceeded our expectations.
Operations Director — Bashir Sons Steel Industry
Our Portfolio

Delivered projects.

Bashir Sons Steel Industry, Kala Shah Kaku, Pakistan
Industrial Solar

Bashir Sons Steel Industry

5 MWp · Kala Shah Kaku, Pakistan
Gourmet Bakeries, Multiple Branches, Pakistan
Commercial Solar

Gourmet Bakeries

3.5 MWp · Multiple Branches, Pakistan
Hajvery Foods, Daska, Sialkot
Industrial Solar

Hajvery Foods

1.2 MWp · Daska, Sialkot
Bashir Sons Steel — Phase 2, Kala Shah Kaku, Pakistan
Industrial Solar
Ongoing

Bashir Sons Steel — Phase 2

10 MWp · Kala Shah Kaku, Pakistan
Al Fateh Steel Mill, Daska, Sialkot
Industrial Solar
Ongoing

Al Fateh Steel Mill

6 MWp · Daska, Sialkot
Azaan Flour Mill, Pakistan
Commercial Solar
Ongoing

Azaan Flour Mill

Commercial · Pakistan
Start a project →
Track Record

Two decades of load paths.

2009

Founded in Lahore

Exa Engineering opens its practice, taking on structural and civil-construction commissions across Punjab.

2016

First megawatt solar array

The firm moves into utility-scale renewable energy, engineering its first megawatt-class industrial PV installation.

2022

Pakistan's largest 150 MW project

Exa delivers the country's largest single solar project at 150 MW, setting a national benchmark in renewable energy.

2025

700th project delivered

The firm passes 700 delivered installations across nine industry sectors, with a 24/7 monitoring desk online.

Client Notes

Read directly from the field.

Exa Engineering delivered a massive solar solution that powers our entire steel operation. The savings and reliability have exceeded our expectations.

Operations DirectorBashir Sons Steel, Kala Shah Kaku

Their multi-site installation keeps our bakeries running smoothly across all locations. A game-changer for our operations.

Facilities ManagerGourmet Bakeries, Pakistan

The solar system from Exa Engineering has transformed our processing facility's energy profile — reliable power and significant savings.

Plant ManagerHajvery Foods, Daska
Leadership

The engineers of record.

MA

Muhammad Ashiq

Chief Executive Officer

Leads Exa Engineering's vision across structural, civil-construction, and solar practices.

MH

Muhammad Hussnain

Business Manager

Oversees client engagements, commercial strategy, and day-to-day operations.

GA

Ghulam Ahmad

Project Manager

Manages end-to-end project delivery and construction oversight across active sites.

National Reach

Four desks, one standard.

Lahore

31.5204° N, 74.3587° E
HQ — PKT
Head Office
Get directions →

Sialkot

32.4945° N, 74.5229° E
Punjab — PKT
Field Operations

Kala Shah Kaku

31.7167° N, 74.2667° E
Punjab — PKT
Industrial Projects

Islamabad

33.6844° N, 73.0479° E
Capital — PKT
Consulting Desk
FAQ

Common questions.

Don't see your question here — reach the operations desk directly.

What project sizes do you take on?+

From single-structure feasibility studies to Pakistan's largest 150 MW solar project. Scope is set in the first consultation, and every engagement gets the same peer-review process regardless of size.

Which disciplines does Exa Engineering cover?+

Structural and civil construction — roads, bridges, underpasses, and buildings — alongside utility-scale and industrial solar. Our renewable-energy practice has its own dedicated page.

Do you provide construction-phase oversight?+

Yes — Stage 04 of our process places a field engineer on site through commissioning, with regular as-built reconciliation against the approved model.

How quickly can you start a feasibility review?+

Typically within two weeks of a signed engagement letter, and sooner for existing clients with data already on file with our operations desk.

Start a Project

Ready to build what's next?

Partner with us for world-class structural engineering and infrastructure consulting.

Request Consultation

+92 314 1444880info@exaengineering.com